High Salt Water Evaporation Project For Organic Chemical Enterprise
High Salt Water Evaporation Project For Organic Chemical Enterprise
Project location: Wendeng District, Weihai City,Shandong Province, China
Production materials: Treatment of high-salt and high-organic wastewater;
Processing materials: Evaporation and crystallization treatment of high-salt and high-organic wastewater containing sodium chloride;
Processing scale: 20t/h;
Project introduction: The project is for high-salt and high-organic wastewater containing sodium chloride produced by battery electrolyte production.using pretreatment + MVR evaporation treatment process, evaporation treatment is carried out after reducing the impurities in the raw water to ensure the stable operation of the equipment.
Equipment material: TA2 material is used for the heat exchanger tubes of the project 2205 is used for the contact parts of other materials.
MVR temperature: 90-94 degree celsius;
Evaporation capacity. maximum 22t/h.
Cost per ton of water. The comprehensive cost of the project is about 38yuan/evaporated ton of water;